Poker Room continued
December was a bad month for the basement. With my vacation to Hawaii and the holidays and plus I was sick half the time, I only managed to put in the door frame for the mini unfinished storage closet and the window framing for the last window.
Simon came over today to finish up the final wall for the poker room. When we were prepping for the soffit for the I-Beam, I realized that we will have a problem with the soffit because the wall on the right side was about 1.5 inches longer then the one on the left. We could no control the left wall because it was laid that way with the door frame. The executive decision was made to F'it and go with the flow. It shouldn't be that bad. The side by the door will have a little bump sticking out.
Hopefully it should not be too noticable.
Here are the pics to the almost finished Poker Room.